Skip to main content
$57.94
$28.97
↻ Risk-free
Save $28.97 (50%)

Uplifted Finds

9K+ Sold

or 4 interest-free installments of $7.24 with Klarna BadgeAfterpay Badge

size:

1.5m

Quantity

1
In stock — Ready to be delivered

Guaranteed Safe & Secured Checkout

Provide your pet with the perfect balance of freedom and safety with this Heavy-Duty Nylon Long Lead. Whether you are working on recall training with a new puppy or allowing a high-energy Labrador to explore during a hike, this versatile leash is designed for the job. Available in lengths ranging from a standard 1.5m to an expansive 30m, it provides the ultimate "off-leash feel" while you maintain a secure connection at all times.

Constructed from high-density reinforced nylon, this lead is lightweight enough for small cats and puppies but strong enough to handle the pulling power of large breeds. The weather-resistant material ensures it won't become heavy or waterlogged during rainy walks or beach trips. Equipped with a 360° rotating chrome-plated clasp, it prevents the rope from tangling as your pet wanders, providing a smooth and frustration-free experience for both of you.


Key Specifications

  • Multiple Length Options: Choose from 1.5m, 3m, 5m, 10m, 15m, 20m, and 30m to suit your specific training or hiking needs.

  • Reinforced Nylon Webbing: High-tensile strength material that is both durable and easy to clean after muddy outings.

  • 360° Tangle-Free Swivel: Heavy-duty metal clip rotates freely to accommodate your pet's erratic movements.

  • Essential Training Tool: The 10m–30m lengths are ideal for teaching "come" and "stay" commands in open fields.

  • Lightweight & Compact: Easily coils up for storage in your pocket or glove compartment.

  • Secure Hand Loop: Features a reinforced stitched handle for a comfortable and firm grip during active exploration.

  • Vibrant Safety Colors: Available in high-contrast shades for better visibility in tall grass or low-light conditions.

Shop Reviews  (1226)

Questions 

Returns:Accepted
↻14-day returns
Uplifted Finds Shop logo
|

9,408 Sold