()

SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control

Inspired Finds

14K+ Sold

$823.98
$411.99
↻ Risk-free
Save $411.99 (50%)

version:

ut-p2

SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 6
SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 7
SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 8
SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 9
SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 10
SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 11
SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 12
SIMJACK UT Sim Racing Pedals  Hydraulic Load Cell Pedals With Pressure Sensor For Realistic PC Raci 13

Quantity

1
In stock — Ready to be delivered
30people viewing right now.

Guaranteed Safe & Secured Checkout

About this item

Racing is all about control, precision, and immersion. The sim racing pedals from SIMJACK deliver a professional-grade experience with pressure sensor and load cell technology that mimics the feel of real car pedals. Built with a durable hydraulic system, these pedals respond naturally to every press, giving you consistent feedback lap after lap. Whether you’re training for competition or looking to elevate your PC racing setup, the hydraulic racing pedals offer the realism and reliability serious drivers demand.


Key Features

  • Advanced load cell and pressure sensor for true-to-life braking response.

  • Hydraulic pedal design provides smooth, consistent resistance.

  • Sturdy metal construction ensures durability for long sessions.

  • Adjustable setup for custom fit and driving style.

  • Plug-and-play compatibility with PC racing simulators.

Why Choose Our SIMJACK UT Sim Racing Pedals
Most entry-level pedals rely on springs, leading to inconsistent feel and limited realism. The SIMJACK UT stands apart with a hydraulic load cell system that translates pressure into accurate braking power—just like in a real race car. Its precision and reliability help you improve lap times, train muscle memory, and enjoy a far more immersive simulation compared to standard pedal sets.

Perfect For

  • Serious sim racing enthusiasts upgrading their setup.

  • PC gamers who want authentic pedal feedback.

  • Training environments for aspiring drivers.

  • Racing simulator builds designed for endurance and immersion.

Product Specs

  • Pedal Type: UT Hydraulic Load Cell

  • Compatibility: PC Sim Racing Systems

  • Materials: High-strength metal body with hydraulic system

  • Sensors: Pressure + Load Cell


Drive With Realism, Compete With Confidence
Step into the race with SIMJACK UT Sim Racing Pedals and feel the difference of true hydraulic control. Upgrade your simulator today and experience professional-level performance from the comfort of your home.

Shop Reviews  (1196)

Questions 

This shop has no reviews yet

Delivery & Return Policy

Shipping and Return Policy
Returns:Accepted
14-day returns

Meet your seller

Inspired Finds Shop logo

Inspired Finds

Message
|

14,333 Sold